Hökməli məktəbi geologiya reconstruction design mühəndisi geoloji engineering geological

RECONSTRUCTION PROJECT OF HOKMELI SCHOOL (ENGINEERING)

To carry out engineering geological and soil laboratory research related to the reconstruction of the high school in Hokmeli settlement. PROKON and CASPIAN GEOMATICS signed an agreement to provide engineering services for the design and construction of a new  school.

Above all, the engineering geological studies aimed to investigate the geological-lithological structure and hydrogeological conditions of the area. Most important, the team determined the physical-mechanical properties of the soils beneath the foundation core, assessed the degree of aggressiveness of the soils against the reinforced concrete structure, and examined the exogenous-geological processes. As a result, to achieve these objectives, they drilled 23 geological boreholes in the area, resulting in a total drilling volume of 245 p.m.:

  • 9 boreholes with a depth of 12 m;
  • 5 boreholes with a depth of 11 m;
  • 7 boreholes with a depth of 10 m;
  • 2 boreholes with a depth of 6 m.

In the end, a report on engineering geological issues was prepared and defended by CASPIAN GEOMATICS (Ministry of Emergency Situations).

PROKON LLC is a subsidiary of Nobel Energy, specializing in design adaptation, procurement and construction management of integrated infrastructure, industrial enterprises and facility construction processes. Since its establishment in 2012, PROKON has been providing professional services for international industrial projects.

post your comment

Khojali Avenue 55, AGA Business Center 4th floor, Baku, Azerbaijan, AZ1025 [email protected] (+994) 55 646 45 83 (WhatsApp)
× WhatsApp Chat