Topographic survey of the railways
The total volume of topographic survey was 14746.9 m. On the basis of the bilateral contract, engineering-topographical surveys
The total volume of topographic survey was 14746.9 m. On the basis of the bilateral contract, engineering-topographical surveys
Wire Line drilling - 1220 meters, Seismic -1.0 km, SPT, Pressiometer test, Inclinometer test - 120 meters. In
A bilateral agreement has been signed to create a Geographical Information System and compile thematic maps of the
Bathymetric surveys were conducted in 3 ha, investigation of exogenous processes was carried out along 300 meters of
In order to improve the water supply of Turkan settlement of Khazar district, there is a need to
In order to improve the water supply of Gala settlement of Khazar district, there is a need to
Our specialists was compiled the map of Shusha city using with GIS. At the same time, the city's
On August 8, the first field survey has started in the pilot area on the Caspian Sea coast
The final reporting event of “Training for teachers who will teach geography with application of Geographical Information Systems
“GIS and The Environment” Stage I training, which was arranged by CASPIAN GEOMATICS, took place in November 28,