Engineering-geological investigation in Khazar district
Engineering-geological surveys were conducted for design of the reservoir (160 x 80 m), the scope of drilling was
Engineering-geological surveys were conducted for design of the reservoir (160 x 80 m), the scope of drilling was
Topographic surveys of arable lands in 8000 ha were conducted, the project area was mapped on the basis
Bathymetric surveys were conducted to a depth of 1.40 meters, and the project area was mapped based on
Geodetic surveys were conducted in 1.3 ha, asbuilt surveying was carried out on a scale of 1: 100.
Bathymetry investigations were carried out in the project area, a topographic plan was compiled at a scale of
Bathymetric surveys were conducted to investigate the bottom relief, topographic surveying was carried out on a scale of
Topographic surveys were carried out in 4000 ha, topographic plan was compiled on the scale of 1: 5000.
Orthophotoplans were prepared based on satellite data in 7000 ha , topographic surveying was carried out based on
Boyukshor Lake Rehabilitation Project is realizing according to the decree of President "State Program on development of socio